Roberts Communications Network

Roberts Communications Network contracted Broadcast Management Group to provide engineering and design support for their new 45,000 square foot Network […]

Project Details

System Integration

Roberts Communications Network contracted Broadcast Management Group to provide engineering and design support for their new 45,000 square foot Network Operations Center in Henderson, NV. The facility includes a 22-dish satellite farm, an equipment room with 96 racks of equipment, a network operations center with a 60-monitor video wall, and 8 master control rooms. Broadcast Management Group was responsible for creating all the system wiring drawings, wire run lists, and cut sheets. The system includes HD/SDI, fiber, ASI, L-Band, IP Video, network, VoIP, and RF signals. Over 25,000 cables were required to complete the new facility. The AutoCAD package included over 200 engineering wiring drawings.

Back to Case Studies
  • ClientRoberts Communications Network
  • LocationHenderson, NV
  • Deliverables Broadcast engineering design support for the new Network Operations Center Create an AutoCAD drawing package of the broadcast network Create a wire run list for every wire that will be installed in the new facility Specify the types of cable that will be required for every signal type Calculate the amount of wire that will be required in the facility Design the equipment layout for every rack in the new facility Offer system integration guidance on the best way to integrate the facility
Related Projects